Skip to the content
Novixo

Consulting services

Hands-on help with safety systems, migrations and validation

Alongside our software we work on the systems safety teams already run. Our consultants have implemented and supported safety databases, moved data between them, and written the validation that goes with it.

Oracle Argus Safety

Implementation, upgrade, configuration and running support for Argus Safety, by people who know both the application and the work it is used for.

  • Implementation and upgrades of Argus 8.x
  • Configuration, workflow and reporting rules
  • Performance review and tuning
  • Integration with intake, gateways and reporting tools
  • Support for validation and inspections

Safety database migration

Moving cases from a legacy pharmacovigilance system to a new one, with every record accounted for and the old data still readable in the terms of the new system.

  • Assessment of the legacy system and a migration plan
  • Data mapping and transformation rules
  • E2B(R2) to E2B(R3) conversion
  • Reconciliation and verification of what was migrated
  • Migration to cloud-hosted platforms

AI implementation

Introducing automation into pharmacovigilance where it earns its place, under change control, with a way of measuring whether it is right.

  • Where in your process automation is worth it
  • Evaluation sets built from your own, de-identified cases
  • Human review designed in, not added afterwards
  • Integration with the systems you run today
  • Monitoring after go-live

Validation and compliance

Computer system validation and the paperwork around it, written to be executed and to be read by an inspector.

  • Validation to GAMP 5: plan, requirements, risk assessment, IQ, OQ, PQ
  • 21 CFR Part 11 and EU Annex 11 assessments
  • Data integrity (ALCOA+) reviews
  • SOPs and working instructions
  • Preparation for audits and inspections

Process and technical consulting

An outside view of how your safety operation runs, and hands to help change it.

  • Process review and redesign
  • System architecture and vendor selection
  • Regulatory change impact, for example new E2B(R3) requirements
  • Training and change management

How we work

Four stages, each with something to show for it

  1. 01

    Assess

    We look at what you have: systems, volumes, procedures, and what is not working.

  2. 02

    Plan

    A written scope with deliverables, responsibilities and the evidence each step will leave.

  3. 03

    Deliver

    We do the work with your team, in your change control, and document it as we go.

  4. 04

    Hand over

    Your people can run what we leave behind. We stay available for support.

Have a migration or an upgrade coming?

Tell us what you are planning and when. We will tell you how we would approach it, what it needs from your side, and where the risks usually are.